Handled Pro Addendum — Licensed Trades & Home Improvement
Version 2026-10-v1 · Pros who do Plumbing (licensed), HVAC (licensed), Electrical (licensed), Painting (interior & exterior), Remodeling / general contractor, Cameras & low-voltage and Handyman jobs; adds to the Independent Contractor Agreement and wins over it for these trades if they conflict.
The short version
- •Licensed work (plumbing, electrical, HVAC, and residential remodeling and painting over the Michigan threshold) needs a current license in your business's name. Handyman and low-voltage pros never do work that needs a license they don't hold.
- •The licensed party pulls permits; permit costs go on the customer's invoice through a change order. Work passes code and inspections.
- •EPA lead-safe (RRP) certification for painting or remodeling disturbing paint in pre-1978 homes.
- •Licensed and remodel work carries a 1-year workmanship warranty (repairs at no extra payout unless someone else caused the problem).
- •Once we pay you, you waive lien rights for that work — and you pay your suppliers and helpers so customers never face a lien.
- •Clean up every day; shut off and restore utilities safely.
This summary helps you read the agreement; the full text below is what governs.
1. Licenses
Work that Michigan requires a license for goes only to properly licensed pros: plumbing, electrical and mechanical (HVAC) contractor licenses from LARA with work done by a licensed master or journeyman; a Residential Builder or Maintenance & Alteration Contractor license for residential remodeling and painting jobs over the state threshold (currently $600); and EPA Section 608 certification for refrigerant work. The license must be current and held by your business (or its qualifying officer) as the law requires. Handyman and low-voltage pros don't do plumbing, electrical (line-voltage), HVAC or other licensed work — stop and tell us if a job turns out to need it.
2. Permits and inspections
Where a job requires a permit, the licensed party pulls it before work starts, posts it as required, and schedules the inspections. Permit fees are passed to the customer on the invoice through a change order (if not already in the price). Work must meet the applicable codes and pass inspection; fixing a failed inspection caused by your work is at no extra payout.
3. Lead-safe work (RRP)
For painting, remodeling or repair that disturbs painted surfaces in homes or child-occupied facilities built before 1978, the firm must be EPA RRP-certified, a certified renovator must direct the work, and lead-safe practices, the EPA "Renovate Right" pamphlet and record-keeping are required.
4. Workmanship warranty
Licensed-trade and remodel work carries a 1-year workmanship warranty from completion (other work in these trades carries the standard 30-day redo). During the warranty you'll repair defects in your workmanship at no extra payout. Problems caused by others — the customer, another contractor, misuse, normal wear, or manufacturer defects in products you didn't choose — aren't covered, and a repair for them is a new paid job. Manufacturer warranties on products pass to the customer; register them where required. [Confirm with counsel.]
5. Liens and paying your suppliers
Handled collects from the customer and pays you. Once your payout for a job (or phase) is paid, you waive and release any construction lien rights against the customer's property for that work, and you'll sign a written lien waiver in the form Michigan's Construction Lien Act requires if we or the customer ask. You'll pay your suppliers, subcontractors and helpers in full and on time so that no one files a lien against a customer. If a lien is filed because you didn't pay someone, you'll get it released at your cost, and we may use payouts owed to you to pay that person directly. [Confirm with counsel.]
6. Materials
Materials not in the price are bought and reimbursed through the app's approved process (receipt upload; our OK above the auto-approve limit; a change order for big amounts). Use materials that meet code and the scope. Don't substitute a different product the customer chose without their OK through the app.
7. Site care, cleanup and utilities
Protect floors, furniture and finishes; contain dust; clean up at the end of each day and haul away your debris (unless the scope says otherwise). Before shutting off water, gas or power, tell the customer; restore service safely when you're done or explain in the app why you can't. Never leave a hazard (open wiring, gas off without notice, open trenches, unsecured ladders) unattended.